Review operating owner
The case needs a named owner while dependency evidence remains in motion.
Keeps case accountableSite OperationsTaskResult: RecoveredSecondary alert preserves queue context and active-run evidence.
R. Chen / Ward S5 / Bed 9| Blocker | State | Owner | Threshold | Source detail |
|---|---|---|---|---|
| TTO | Complete | Pharmacy | 120 min escalation window | No dominant TTO exception; source Recovered 09:00 |
| Transport | Complete | Transport | 120 min escalation window | Transport checked against active run; source Recovered 09:00 |
| Discharge summary | Complete | Ward Administration | 90% completion floor | Summary checked against configured completion floor |
| Downstream dependency | Protected | Site operations | Admission arrival and theatre buffer | N. Hughes arrival 12:30 / Theatre 4 15:30 protected |
The case needs a named owner while dependency evidence remains in motion.
Keeps case accountableSite OperationsTaskResult: RecoveredOwnership is required where dependency evidence is still moving.
Creates named operating ownerMaya Sutton / Site OperationsTaskResult: Recovered| Measure | Value | Comparator | Threshold | Source | Freshness | Explanation |
|---|---|---|---|---|---|---|
| Primary blocker | Interventions completed; release path recovered | Task status | 120 min escalation window / 90% summary floor | Discharge task source | Recovered 09:00 | Interventions completed; release path recovered |
| Readiness forecast | 38%; Up to 1 hour | Expected discharge | At-risk probability threshold 65% | Prediction snapshot | Recovered 09:00 | Expected discharge 09:45; predicted ready 10:20 |
| Admission exposure | N. Hughes arrival 12:30 | Admission dependency | Same-day protected bed comparator | Admission and bed dependency | Run 09:15 | R. Chen is now protecting N. Hughes arrival 12:30; Theatre 4 15:30 protected remains within the configured buffer. |
| Theatre exposure | Theatre 4 15:30 protected | Protection deadline | 75 min protection buffer | Theatre and recovery context | Run 09:15 | Required ready 11:15; predicted ready 10:20; Protected inside required window |
R. Chen is now protecting N. Hughes arrival 12:30; Theatre 4 15:30 protected remains within the configured buffer. 38% probability; Up to 1 hour forecast; predicted ready 10:20 versus required ready 11:15.